Perancangan Model Penjadwalan Teknisi pada Perawatan BD Check Pesawat Airbus dengan Memperhitungkan Beban Kerja

Adelia Syafitri, Syarif Hidayat

Abstract


PT GMF AeroAsia is engaged in the maintenance, repair, and overhaul (MRO) of aircraft. It is known that GMF is the largest domestic MRO company at 30% while 70% is owned by foreign MRO companies. Based on the company's vision to make the company a world-class MRO, it is necessary to develop a business scheme in terms of capability, quantity, and quality. However, the scheduling of technicians in carrying out aircraft maintenance is currently unable to meet the demand every hour due to the uncertain flight schedule of the aircraft every day so that the workload of each technician exceeds the normal workload. The calculation of the workload using the full-time equivalent method showed that the workload of technicians was overloaded so that an additional number of technicians was needed, as well as analyzing the causes and consequences of the excessive workload of technicians using the fishbone diagram method and modeling the formulation of the technician scheduling problem that works in maintenance before departure check Airbus aircraft in the form of integer linear programming with decision variables such as the number of technicians, the number of shifts and the number of working days, then the constraint function is the constraints to be achieved in modeling, and the objective function is to minimize the number of technicians employed. Furthermore, the model is implemented using the LINGO 19.0 software so that it is found that the model can produce an optimal technician schedule in scheduling.

KeywordsFishbone Diagram, Full Time Equivalent, Integer Linear Programming, Lingo Software, Matchematical Modeling, Scheduling, Workload


Full Text:

PDF

References


A. d. Sukmawati, "Analisis Beban Kerja Sumber Daya Manusia Dalam Aktivitas Produksi Komoditi Sayuran Selada," Fakultas Ekonomi dan Manajemen, Bogor, 2013.

A. d. Warta, "Persaingan Airbus dan Boeing di Industri Jasa Angkutan Udara Indonesia," Jurnal Perhubungan Udara, vol. 39 , no. No 4 Desember 2013, pp. 244-258, 2013.

D. &. B. E. Bedworth, "Integrated Production and Control System Management Analysis Design 2.E," John Wilet and Sons. Inc, 1987.

B. A. M. M. 12-51-15, Boeing 737-300/400 Continuous Airwirthiness Perawatan Program, Document No:B733/40/01/02, Surabaya-Indonesia: PT Merpati Nusantara Airlines-Merpati Perawatan & Engineering, 2009.

T. K. Bose, "Aplication of Fishbone Analysis for Evaluating Supply Chain and Business Process-A Case Study on The St. James Hospital," International Journal of Managing Value and Supply Chains, vol. Vol 3 No 2, 2012.

D. d. Satrya, "Analisis Kebutuhan Tenaga Kerja Berdasarkan Beban Kerja Karyawan pada PT PLN (Persero) Distribusi Jakarta Raya dan Tangerang Bidang Sumber Daya Manusia dan Organisasi," Universitas Indonesia, Jakarta, 2012.

N. R. Dinamik, "Penjadwalan Teknisi A/P dan E/A Menggunakan Metode Goal Programming pada Outstation Service PT GMF AEROASIA," Universitas Brawijaya, Malang, 2016.

K. &. V. Gurunathan, "Manpower Planning as an Aspect Towards Employee Retention," Indian Journal of Applied Research, vol. 2, pp. 115-117, 2012.

K. M. d. M. Hermanto, "Pengoptimuman Penjadwalan Perawat pada Instalasi Ruang Inap RSU Propinsi NTB," vol. 4, no. 1 Mei 2011, pp. p-ISSN : 2085-5893, e-ISSN: 2541-0458, 2011.




DOI: http://dx.doi.org/10.36722/sst.v7i1.870

Refbacks

  • There are currently no refbacks.


LP2M (Lembaga Penelitian dan Pengembangan Masyarakat)

Universitas AL-AZHAR INDONESIA, Lt.2 Ruang 207

Kompleks Masjid Agung Al Azhar

Jl. Sisingamangaraja, Kebayoran Baru

Jakarta Selatan 12110

Visitor

 This work is licensed under CC BY 4.0