Line Balancing Pada Produksi Kabel Serat Optik Dengan Metode Ranked Positional Weight
Abstract
PT. XYZ produces and manufactures fiber optic cables and pipes in Indonesia. The problem faced in the production section is the imbalance in the work load at each work station. This situation causes bottleneck or accumulation of SF-Product which greatly affects the production operator's performance. The method used is Line Balancing and Ranked Positional Weight to provide the balanced load on all production process factors existing on the production line so as to reduce the difference in operating time between work stations and decrease idle time in the fiber optic cable production process. This study gives the number of machines on the Coloring Line, Buffering Line, Small Jacketing Line, Stranding Line, and Jacketing Line should be 5. There is a combination of tasks on Coloring Line 1 & 2 to meet the needs of Buffering Line 1, and also a combination of tasks on Buffering Line 1 & 2 to meet the needs of Stranding Line 1. In addition, balanced work time assignment in Section 1 is 3115.17 minutes, Section 2 is 2829.428 minutes, Section 3 is 2094.424 minutes, Section 4 is 2094.424 minutes, and Section 5 is 2094.424 minutes.
Keywords – Line Balancing, Ranked Positional Weight, Stopwatch Time Study.
Full Text:
PDFReferences
A. B. Sulistyo, “Perencanaan Line Balancing Proses Produksi Pada Shearing Line Plant Dengan Menggunakan Metode Rank Position Weight,” J. PASTI (Penelitian dan Apl. Sist. dan Tek. Ind.), vol. 16, no. 1, p. 49, 2022, doi: 10.22441/pasti.2022.v16i1.005.
A. Yemane, G. Gebremicheal, T. Meraha, and M. Hailemicheal, “Productivity improvement through line balancing by using simulation modeling (case study almeda garment factory),” J. Optim. Ind. Eng., vol. 13, no. 1, pp. 153–165, 2020, doi: 10.22094/JOIE.2019.567816.1565.
R. D. Astuti and H. S. A. Edy purwanto, “Perbaikan Line Balancing Proses Packing Tablet Xyz Menggunakan Metode Ranked Positional Weight Di PT. Y,” Performa Media Ilm. Tek. Ind., vol. 18, no. 1, pp. 46–57, 2019, doi: 10.20961/performa.18.1.32360.
A. Flocerfida L, D. S. Rafael A, and T. Rodolfo Jr. V, “Productivity Improvement in a Sewing Line Through Line Balancing in a Garment Manufacturing Company in the Philippines.” International Journal of Trend in Scientific Research and Development (IJTSRD) vol. 2, no. 4, pp. 2598– 2604, 2018, doi: http://dx.doi.org/10.31142/ijtsrd15666.
M. Afifuddin, “Penerapan Line Balancing Menggunakan Metode Ranked Position Weight (RPW) untuk Meningkatkan Output Produksi pada Home Industri Pembuatan Sepatu Bola,” J. Ind. Eng. Manag., vol. 4, no. 1, p. 38, 2019, doi: 10.33536/jiem.v4i1.287.
M. Faqih Mujahidulloh and rer Oec Arfan Bakhtiar, “Analisis Line Balancing Untuk Keseimbangan Proses Produksi Antimo Tablet Di Pt. Phapros Semarang,” Industrial Engineering Online Journal, vol. 10, no. 4, 2022.
A. R. Wisnuadi and F. Fahma, “Analisis Tidak Terpenuhinya Target Output Produksi Channel 7 Pada Proses Permesinan Di PT. SKF Indonesia,” Semin. dan Konf. Nas. IDEC 2017, p. 216, 2017.
A. Fawa, I. Fata1, A. Widarman, and H. S. Yudha, “Analisis Keseimbangan Lintasan Produksi Assembly Battery Motorcycle Fb5L-B Menggunakan Metode Ranked Positional Weight Production Cross Balance Analysis Assembly Battery Motorcycle Fb5L-B Using Ranked Positional Weight Method,” J. Teknol., pp. 1–12.
W. P. Febriani, M. A. Saputra, and D. S. B. F. Lumbanraja, “Penerapan Konsep Line Balancing Dalam Proses Produksi Pintu Dengan Metode Ranked Position Weight Di CV Indah Jati Permana,” Bull. Appl. Ind. Eng. Theory, vol. 1, no. 2, pp. 1–6, 2020.
N. N. Fajrina, T. Taviyastuti, and R. Rustono, “Pengaruh Implementasi Time and Motion Study Dan Biaya Bahan Baku Terhadap Biaya Finishing Produk Pada Departemen Finishing Pt Harrison & Gil Java Semarang,” Admisi dan Bisnis, vol. 20, no. 1, p. 75, 2019, doi: 10.32497/ab.v20i1.1427.
L. Nofita Sari, “Pengukuran Keseimbangan Lintasan Produksi Upper di PT.EID Dengan Metode Ranked Positional Weight (RPW) Untuk Meningkatkan Efisiensi dan Produktivitas Kerja,” Univ. Muhammadiyah Sidoarjo, vol. 01, pp. 1–78, 2018.
DOI: http://dx.doi.org/10.36722/sst.v9i2.2319
Refbacks
- There are currently no refbacks.
LP2M (Lembaga Penelitian dan Pengembangan Masyarakat)
Universitas AL-AZHAR INDONESIA, Lt.2 Ruang 207
Kompleks Masjid Agung Al Azhar
Jl. Sisingamangaraja, Kebayoran Baru
Jakarta Selatan 12110
This work is licensed under CC BY 4.0