Perancangan Project Management Office (PMO) Berdasarkan Fungsi PMO, Keberhasilan Proyek, dan Kinerja Organisasi (Studi Kasus PT YZ)

Irma Novianti, Endang Chumaidiyah, Ilma Mufidah

Abstract


The PMO design in this study was carried out because the PMO need to strengthen its function so that the PMO can mobilize its full potential according to organizational goals. This study aims to determine the stages of establishing and implementing PMO Initiation, identifying PMO functions and its indicators, analyzing the importance level of results no. 2 towards improving project results & organizational performance, designing business processes & PMO Initiation SOPs. The methods used are expert judgment, AHP, descriptive statistics and BPMN. The results showed that there were 11 stages of establishing and implementing PMO Initiation, 3 PMO functions, 9 PMO function indicators, each 2 success criteria for improving project outcomes and organizational performance. This research also produces business process designs: division (1), department (5) and PMO (3). The managerial implication gives 3 draft PMO SOPs. This PMO design is based on the identification of PMO functions that affect business processes & it is the first time to be done. Modeling and documenting the business processes that occur can identify bottlenecks and improve cross-functional work alignment throughout project activities [1].

Keywords: Design, PMO Functions, Project Results, Organization Performance, Business Process.


Full Text:

PDF

References


E. Ahoa, A. Kassahun, and B. Tekinerdogan, “Business processes and information systems in the Ghana cocoa supply chain: A survey study”, ScienceDirect Publishing, https://www.sciencedirect.com/science/article/pii/S1573521419300740, 2020. (Diakses pada 2 September 2022)

A. J. Shenhar and D. Dvir, Reinventing Project Management_The Diaamond Approach to Successful Growth and Innovation, Harvard Business School Press, Boston USA, p.40, p.162, 2007.

C. Oliveira, A. Tereso, and G. Fernandes, “PMO Conceptualization for Engineering and Construction Businesses”, ScienceDirect Publishing, https://www.sciencedirect.com/science/article/pii/S1877050917322780, 2017. (Diakses pada 7 Januari 2021)

S. C. M. Barbalho, J. Carlos de Toledo, and A. C. Cintra Farias, “Transitions in Project Management Offices: A Framework Relating Functions, Success Factors and Project Performance in a High-Technology Company”, Taylor & Francis Publishing, https://www.tandfonline.com/doi/abs/10.1080/10429247.2021.1925497, 2021. (Diakses pada 9 Januari 2022)

B. Hobbs and M. Aubry, “A Multi-Phase Research Program Investigating PMOs The Results of Phase 1”, Sage Publishing, https://journals.sagepub.com/doi/10.1177/875697280703800108, 2007. (Diakses pada 4 Juni 2021)

J. K. Crawford, The Strategic Project Office Second Edition. PM Solutions Inc, Pennsylvania USA, p.34, 2011.

M. G. Hill and J. LeRoy. Ward, The Complete Project Management Handbook, 3rd Edition. Florida USA, p.xxxi: CRC Press, imprint of the Taylor & Francis Group, 2013.

H. Salameh, “A Framework to Establish a Project Management Office”, IISTE Publishing, https://iiste.org/Journals/index.php/EJBM/article/view/11753, 2014. (Diakses pada 14 April 2021)

J. van der Linde and H. Steyn, “The effect of a project management office on project and organisational performance: A case study”, SAJIE Publishing, http://sajie.journals.ac.za/pub/article/view/1114, 2016. (Diakses pada 9 April 2021).

A. P. C. Chan and A. P. L. Chan, “Key Performance Indicators for Measuring Construction Success”, Emerald Publishing, https://www.emerald.com/insight/content/doi/10.1108/14635770410532624/full/html, 2004. (Diakses pada 8 Desember 2021)

PM Solutions Research, “The State of the Project Management Office (PMO) 2016 Enabling Strategy Execution Excellence 2, PM Solution Inc, https://www.pmsolutions.com/reports/State_of_the_PMO_2016_Research_Report.pdf, 2016. (Diakses pada 23 Desember 2021)

L. M. Hurt and J. L. Thomas, “Building Value Through Sustainable Project Management Offices PAPERS Authors Focus of Paper Key Findings/Observations”, Wiley Publishing, https://onlinelibrary.wiley.com/action/doSearch?AllField=Building+Value+Through+Sustainable+Project+Management+Offices, 2009. (Diakses pada 7 Desember 2021)

K. Suryadi and Ramdhan Ali, Sistem Pendukung Keputusan edisi ketiga, Penerbit PT Remaja Rosdakarya, Bandung, 2017.

Sugiyono, Metode Penelitian Kuantitatif edisi ketiga. Penerbit PT Alfabeta, Yogyakarta, 2022.

Badan Standardisasi Nasional, “SNI Sistem Manajemen Mutu-Persyaratan (ISO 9001:2015)”, Penerbit BSN, https://www.academia.edu/28644578/Standar_Nasional_Indonesia_SNI_ISO_9001_2015_Sistem_manajemen_mutu_Persyaratan_Quality_management_systems_Requirements, p. iv, 2015. (Diakses pada 24 Desember 2021)

OMG (Object Management Group), “Business Process Model and Notation (BPMN) Version 2.0.2”, OMG Publisher, http://www.omg.org/spec/BPMN, 2013. (Diakses pada 24 Januari 2022)

Project Management Institute, A Guide to The Project Management Body of Knowledge (PMBOK Guide), 6th edition. Pennsylvania: PMI, Inc, p.48, 2017.

F. Taymouri, M. la Rosa, M. Dumas, and F. M. Maggi, “Business Process Variant Analysis: Survey and Classification”, ScienceDirect Publishing, https://www.sciencedirect.com/science/article/pii/S0950705120306869, 2021. (Diakses pada 2 September 2022)

A. Soemowihadwidjojo, Menyusun SOP Itu Mudah edisi keempat, Penerbit PT Penebar Plus, Jakarta Pusat, 2018.

M. M. de Carvalho, L. A. Patah, and D. de Souza Bido, “Project Management and Its Effects on Project Success: Cross-Country and Cross-Industry Comparisons”, ScienceDirect Publishing, https://www.sciencedirect.com/science/article/abs/pii/S0263786315000733, 2015. (Diakses pada 8 Desember 2021)




DOI: http://dx.doi.org/10.36722/sst.v8i3.1867

Refbacks

  • There are currently no refbacks.


LP2M (Lembaga Penelitian dan Pengembangan Masyarakat)

Universitas AL-AZHAR INDONESIA, Lt.2 Ruang 207

Kompleks Masjid Agung Al Azhar

Jl. Sisingamangaraja, Kebayoran Baru

Jakarta Selatan 12110

Visitor