Casting machine is a production tool with the function of molding liquid aluminum into velq products used at PT XYZ. In carrying out the production process, casting machines often experience failures that affect the high machine downtime and also the ineffective use of machines to run the production process. The purpose of this research is to implement Total Productive Maintenance by analyzing the use of machines with the OEE method to determine the value of their effectiveness and conducting breakdown analysis using the 5 why's analysis method to find the root of the problem that affects the calculation of the OEE value of the machine so that a solution can be formulated to overcome these problems. Based on OEE calculations on the casting machine for the January-June 2022 period, the performance rate measurements in January and May were 89. 19% and 83.28% which were below the Nakajima standard. The results of the May performance rate calculation have an impact on the OEE value which does not reach the standard of 82.17%. By using 5 Why's analysis, the cause of the low performance rate value in both months is the operator who makes changes to the machine settings so that the actual cycle time of machine operation is higher than before and causes reduced speed losses.

Keywords - Casting machine, OEE, performance rate, 5 why’s analysis, reduce speed losses


Full Text:

PDF

References


C. Eko, “Ketersediaan Produk Dan Harga Di Toko Sama Tani Terhadap Keputusan Pembelian Pupuk Bersubsidi (Studi Pada Petani Padi Sawah Desa Tonusu),” Univ. Andalas, vol. 10, no. 3, p. 1, 2014.

T. Suhartati, “Pentingnya Kualitas Produk Dan Kepuasan Pelanggan Guna Mewujudkan Loyalitas Pelanggan Toast Story Di Kota Malang,” آب و خاک, no. May, p. 106, 2013.

N. C. Dewi and D. I. Rinawati, “Analisis Penerapan Total Productive Maintenance (TPM) Dengan Perhitungan Overall Equipment Efectiveness (OEE) Dan Six Big Losses Mesin Cavitec PT. Essentra Surabaya (Studi Kasus PT. Essentra),” Ind. Eng. Online J., vol. 4, no. 4, 2016, [Online]. Available: https://ejournal3.undip.ac.id/index.php/ieoj/article/view/9868

J. R. Díaz-Reza, J. L. García-Alcaraz, and V. Martínez-Loya, Impact Analysis of Total Productive Maintenance. Ciudad Juárez: Springer Nature Switzerland, 2019. doi: 10.1007/978-3-030-01725-5.

F. Cahya and A. Pusakaningwati, “Usulan Perbaikan terhadap Manajemen Perawatan dengan Menggunakan Metode Total Productive Maintenance (TPM) di PT. SNA MEDIKA,” 2018.

S. T. Dziuba, M. A. Jarossová, and N. Gołębiecka, “Applying the 5 Why Method To Verification of Non-Compliance Causes Established Afterapplication of the Ishikawa Diagram,” Prod. Eng. Arch., vol. 2/1, pp. 16–19, 2014, doi: 10.30657/pea.2014.02.05.




DOI: http://dx.doi.org/10.36722/exc.v2i1.2340

Refbacks

  • There are currently no refbacks.